Selection Matrix - FIU


The Feasibility-Impact-Urgency Selection Matrix will improve your ability to make correct decisions and solve problems.

FIU

FIU Procedure

  • List the options
  • Clarify the rating criteria ( "Feasibility" means what in your situation?)
  • Rate each item (1, 3 or 5 with 1 = Low, 5 = High)
  • Sum F+I+U and invert and rank (highest sum is first rank).

Variations

  • Use a High-Medium-Low rating approach and then convert to a numeric scale
  • Use a 1 to 10 rating (but 1-3-5 does ensure some separation)
  • Use sub-criteria (e.g. split Feasibility into Cost, Risk, Suitability)
  • Use additional criteria.